HEALTHCARE STRUCTURES EXPERTISE

 

PROCESS MANAGEMENT

PRELIMINARY PERMIT DOCUMENT: The architectural project has a preliminary authorization license since it was made in accordance with the Ministry of Health’s construction regulations.

DESIGN AND CONSTRUCTION: Employer approval is acquired, necessary project designs are created, municipal licensing projects are developed, and construction license is completed.

Then, implementation projects are prepared.

Construction work plans are made in the light of these projects, construction is completed in the light of these plans.

JOINT TECHNICAL REPORT: After the construction is carried out in accordance with the Ministry of Health construction regulations, the works are delivered to the Technical Inspection Board and a Joint Technical Report is obtained.

DESIGN AND CONSTRUCTION

With our high experience in healthcare structures, we prepare projects that meet customer needs and gain their appreciation. Thanks to our irreversible project studies, we provide time advantage in the management of Ministry of Health project approval processes. With our construction experience in healthcare structures, we prepare projects that provide time and investment cost advantage.

ARCHITECTURE

1- Effective solutions for business profitability, ensuring a dynamic operation in light of the specifications

2- Investor requests and function requirements are 100% provided. Investor approval is essential.

3- Advantage in irreversible projects and Ministry of Health process management

INTERIOR DESIGN

1- Aesthetic, functional and relaxing interior designs for healthcare workers, patients and relatives

2 – Every effort is made to guarantee that the designs align with the company’s standards and the clientele

ENGINEERING

1- Competent static project designs that provide construction facilities

2- Profitable mechanical project designs that provide comfort and hygiene conditions of health structures

3- Operational electrical project designs that provide comfort conditions of health structures

CONSTRUCTION

1- Planning studies (budget, cash flow and target time-based work program) and real targets for construction period and investment costs are determined.

2- Construction work progresses and is completed in the light of these plans.

3- Works determined in the work program are completed with high efficiency with project management capability.

4- The investor has 100% control over the construction process with physical and monetary realization reports.

5- Advantage is provided in investment costs by determining practical alternatives in construction methods.

6- The structure is made ready for use as turnkey with high quality standard applications.

7- Advantage is provided in the Ministry of Health Activity Approval process management with irreversible manufacturing.

Reference Branches

General Hospitals
Nuclear Medicine and Radiation Oncology Units
Imaging Units
Medical Oncology Units
Intensive Care Units (Burn-CVC etc.)
Operating Rooms